3. Import Prod Dump File
This procedure SCHEMA_REFRESH.IMPORT_PROD imports the Production database export dump file into the Test database. Listing 3 lists the API that shows how the prod dump file is imported in the Test database using data pump technology.
procedure import_prod
as
ind NUMBER; -- Loop index
h1 NUMBER; -- Data Pump job handle
percent_done NUMBER; -- Percentage of job complete
job_state VARCHAR2(30); -- To keep track of job state
le ku$_LogEntry; -- For WIP and error messages
js ku$_JobStatus; -- The job status from get_status
-- jd ku$_JobDesc; -- The job description from get_status
sts ku$_Status; -- The status object returned by get_status
BEGIN
-- Create a (user-named) Data Pump job to do a "full" import (everything
-- in the dump file without filtering).
h1 := dbms_datapump.open (operation => 'IMPORT', job_mode => 'FULL', version => 'COMPATIBLE');
dbms_datapump.add_file(handle => h1, filename => 'IMPDAT.LOG', filetype => 3);
dbms_datapump.add_file(handle => h1, filename => 'refresh.dmp', filetype => 1);
-- If a table already exists in the destination schema, skip it (leave
-- the preexisting table alone). This is the default, but it does not hurt
-- to specify it explicitly.
DBMS_DATAPUMP.SET_PARAMETER(h1,'TABLE_EXISTS_ACTION','SKIP');
DBMS_DATAPUMP.metadata_filter (HANDLE =>h1,NAME => 'EXCLUDE_PATH_EXPR',VALUE=>'IN(''STATISTICS'')');
-- Start the job. An exception is returned if something is not set up properly.
DBMS_DATAPUMP.START_JOB(h1);
-- The import job should now be running. In the following loop, the job is
-- monitored until it completes. In the meantime, progress information is
-- displayed. Note: this is identical to the export example.
percent_done := 0;
job_state := 'UNDEFINED';
while (job_state != 'COMPLETED') and (job_state != 'STOPPED') loop
dbms_datapump.get_status(h1,
dbms_datapump.ku$_status_job_error +
dbms_datapump.ku$_status_job_status +
dbms_datapump.ku$_status_wip,-1,job_state,sts);
js := sts.job_status;
-- If the percentage done changed, display the new value.
if js.percent_done != percent_done
then
dbms_output.put_line('*** Job percent done = ' ||
to_char(js.percent_done));
percent_done := js.percent_done;
end if;
-- If any work-in-progress (WIP) or Error messages were received for the job,
-- display them.
if (bitand(sts.mask,dbms_datapump.ku$_status_wip) != 0)
then
le := sts.wip;
else
if (bitand(sts.mask,dbms_datapump.ku$_status_job_error) != 0)
then
le := sts.error;
else
le := null;
end if;
end if;
if le is not null
then
ind := le.FIRST;
while ind is not null loop
dbms_output.put_line(le(ind).LogText);
ind := le.NEXT(ind);
end loop;
end if;
end loop;
-- Indicate that the job finished and gracefully detach from it.
-- dbms_output.put_line('Job has completed');
--dbms_output.put_line('Final job state = ' || job_state);
dbms_datapump.detach(h1);
exception
when others then
Raise_Application_Error ( -40000, 'Import Data Pump Error ');
END import_prod;


